QualityKnowledge

Optimize the identified risks

Complete the identified risk mitigation actions

The FMEA engineer adds prevention action and detection actions to optimize risks. For each of the prevention and detection actions, the FMEA engineer specifies the due date, occurrence and detection values, and assigns a responsible user for the action.

The responsible user completes the identified risk mitigation actions and the system automatically assigns the completion date.

Procedure

  1. Enter the search criteria in the global search, and click .

  2. In Filters, from Type, select Quality Action.

  3. (Optional) In Filters, from Responsible User, select a user.

  4. In Search Filters, select the prevention action or detection action and click Open .

  5. Click Activate and type a comment.

  6. Click Complete to finish this activity.